mod
No Volatile impact reactor cooldown
changes the magma cooldown from 0.125 to 0
- Latest version
- 1.0
- Downloads
- 191
- Rating
- 40
- Updated
- 2 y ago
- Available on
- mod.io
Download
From No Volatile impact reactor cooldown’s own host. Nothing is re-hosted here.
No file recorded for this release.
Frequently asked
How do I install No Volatile impact reactor cooldown?
Install the matching loader first, then put the downloaded file in your mods folder and start the game. The loader, the mod and Deep Rock Galactic all have to be on the same version, which is the usual reason a mod does not appear in game.
Where do I download No Volatile impact reactor cooldown safely?
From the author's own page on mod.io, which is where the data here is synced from. IndexGG never mirrors, re-hosts or repackages a file: every download button points at the original source, so you get exactly what the author published.
Which Deep Rock Galactic versions does No Volatile impact reactor cooldown work on?
The author has not declared a supported version in the metadata we sync, so there is nothing here we can state as fact. Check the project's own page before installing it, and treat an old mod with no declared version as untested on modern Deep Rock Galactic.