Menu

mod

[200+][Project Imperial] 19th Century + Civil war

by MrStringy

This whole pack includes: Franco-prussian war, Boshin war, American Civil war, Italian Unification, etc. Most factions have 4 classes: Line, Skirmisher, Cavalry, Artillery. Some factions have gatling guns. (Cavalry are broken btw lmao)(sorry)

Latest version
no release indexed
Downloads
4.3k
Rating
927
Filed under
Challenging, Faction
Updated
5 y ago
Available on
mod.io

Download

mod.io does not publish a direct file link; get it from [200+][Project Imperial] 19th Century + Civil war’s own page.

Opens mod.io in a new tab.Get it on mod.io

Frequently asked

How do I install [200+][Project Imperial] 19th Century + Civil war?

Install the matching loader first, then put the downloaded file in your mods folder and start the game. The loader, the mod and Totally Accurate Battle Simulator all have to be on the same version, which is the usual reason a mod does not appear in game.

Where do I download [200+][Project Imperial] 19th Century + Civil war safely?

From the author's own page on mod.io, which is where the data here is synced from. IndexGG never mirrors, re-hosts or repackages a file: every download button points at the original source, so you get exactly what the author published.

Which Totally Accurate Battle Simulator versions does [200+][Project Imperial] 19th Century + Civil war work on?

The author has not declared a supported version in the metadata we sync, so there is nothing here we can state as fact. Check the project's own page before installing it, and treat an old mod with no declared version as untested on modern Totally Accurate Battle Simulator.

Last checked 16 d ago against mod.io. We do not host files and we do not republish descriptions; every download link points at the author’s own release.

Not indexed yet. Score 38 against a threshold of 55. The page still exists and is still linked; it simply carries noindex until we hold more.