mod
South London and Thameslink (Work In Progress!)
by Danny
South London and Thameslink (Work In Progress Version! ) Description Basically this is the South London to Brighton route merged onto the London to Bedford route and includes Bedford to Brighton Via Herne Hill and London Bridge, also includes Blackfrairs to Swanley / Orpington via Herne Hill. how...
- Latest version
- no release indexed
- Downloads
- 11.4k
- Rating
- 400
- Filed under
- Chatham Main Line Route Add-On, electric
- Updated
- 18 mo ago
- Available on
- Steam Workshop
Download
Delivered through the Steam client, not a file this page can link to.
Frequently asked
How do I install South London and Thameslink (Work In Progress!)?
Install the matching loader first, then put the downloaded file in your mods folder and start the game. The loader, the mod and Train Simulator Classic all have to be on the same version, which is the usual reason a mod does not appear in game.
Where do I download South London and Thameslink (Work In Progress!) safely?
From the author's own page on Steam Workshop, which is where the data here is synced from. IndexGG never mirrors, re-hosts or repackages a file: every download button points at the original source, so you get exactly what the author published.
Which Train Simulator Classic versions does South London and Thameslink (Work In Progress!) work on?
The author has not declared a supported version in the metadata we sync, so there is nothing here we can state as fact. Check the project's own page before installing it, and treat an old mod with no declared version as untested on modern Train Simulator Classic.