STEAM_WORKSHOP creator
aantono
2 projects across 1 game, 24.9k downloads in total.
- Projects
- 2
- Game
- 1
- Downloads
- 24.9k
- Last shipped
- 6 y ago
- Kirov PK-6Railroad construction crane PK-6 was manufactured by the Kirov manufacturing plant from the 1930 until mid 1970s in various modifications (PK-6, MK-6, DK-6) 5 workers Construction Speed 25 km/h Travel Speed 45 km/h Available from 1930-1970 Credits: The model is the default Crane and platform from...14.4k downloadsupdated 6 y ago
- Bitumen Upgrading PlantBitumen upgrading is a process by which bitumen is transformed into light oil by fractionation and chemical treatment, removing virtually all traces of sulphur and heavy metals. The resulting oil can then be further refined into fuel. Requires 25 workers Consumes: 10 t of bitumen 0.05 t of chemic...10.5k downloadsupdated 6 y ago