STEAM_WORKSHOP creator
76561198818761379
7 projects across 1 game, 1.6k downloads in total.
- Projects
- 7
- Game
- 1
- Downloads
- 1.6k
- Last shipped
- 2 y ago
- CV Francesco Caracciolo(From Wikipedia) The Francesco Caracciolo-class battleships were a group of four super-dreadnought battleships designed for the Royal Italian Navy in 1913 and ordered in 1914. The first ship of the class, Francesco Caracciolo, was laid down in late 1914 and launched in 1920, and several proposals...285 downloadsupdated 2 y ago
- 自由法兰西号航空母舰鉴于已经开工的“霞飞”号航母理念较为落后,法国于二战爆发前已经在规划建造更大型的正规航母,然而该型航母在法国投降时并没有开始动工,仅有的图纸也被销毁,据称该舰的设计很大程度上参考了英国”皇家方舟“号。法国光复后,航空母舰的建造被重新提上日程,舰名定为”自由法兰西“号,指标也进一步放大,排水量达到30000吨以上,可以搭载80-100架飞机。但由于基础设施破坏严重和战后重建等各种原因,直到1955年法国才开始动工建造属于自己的航母。 In view of the backward concept of the CV Joffre already under construction, Fr...262 downloadsupdated 5 y ago
- HMS Admiral-class Battlecruiser (1915)In order to maintain the status of a great naval power in World War I, the British Navy planned to build new Battlecruisers. The initial design scheme was finalized no later than 1915. Due to the use of oil-fired boilers rather than coal, the power cabin can be greatly compressed, which makes it...238 downloadsupdated 5 y ago
- 拉普兰号驱逐领舰(1955)20世纪40年代中期,瑞典提出建造一支现代化驱逐舰队的计划,其中包括建造一至两艘驱逐领舰以取代充当此角色的"三王冠"级轻巡洋舰。在完成两艘“厄兰”级驱逐舰的建造后,驱逐领舰的建造计划被提上日程。指标要求该舰应装备三座速射主炮塔和完整的电子侦查指挥系统,标准排水量不超过3500吨。最终在减少鱼雷发射管数量后勉强达到设计要求,为弥补鱼雷火力不足,专门为该舰设计了重装填装置和两组备用鱼雷。然而,对于当时技术积累不足的瑞典造船工业而言,该舰过于复杂,在论证阶段就遇到种种问题,且数年间不断有新的武器系统被开发出来,使得该舰的武备尚未建造就显得过时了。最后决定推迟此舰的建造,部分设计成果被用于建造”...237 downloadsupdated 3 y ago
- DD Tribal II(Translated by Google) At the beginning of World War II, the Royal Navy suffered serious losses of first-line destroyers, especially the relatively new Tribal class destroyers. By the end of 1942, only four were left. Therefore, it is planned to optimize the design of the second batch of Tribal c...220 downloadsupdated 4 y ago
- U.S.S Dallas(CA-140)Translated by Google With the end of the war, the US Navy began to reduce military spending, so the Des Moines class heavy cruisers under construction faced the problem of being cancelled because they were too expensive. Some people proposed the concept heavy cruisers that were also equipped with...195 downloadsupdated 3 y ago
- ROCN 6000t Cruiser Project (France)Translated by Google (Fictitious) In 1933, ROC planned to order a cruiser and blueprints from France, and sent personnel to learn ship building techniques. The indicators proposed by the ROC require that the standard displacement should reach 6000 tons,and it can sail in inland rivers, install 6-...194 downloadsupdated 4 y ago